How Long Does It Take to Paint a House in Metro Atlanta?

A typical metro Atlanta house takes several days for a full interior, and most exteriors finish in 3 to 5 days once the crew is on the house. A 3-bedroom interior that is walls only, in the same color, with little repair, is often finished in a couple of days.

Exterior repaint by Atlanta Painting Company in Marietta, GA

Those ranges are how we schedule a standard crew on a house in ordinary condition. Repairs, a large color change, an occupied home and the weather are what move the finish date.

How long does it take to paint a typical metro Atlanta house, interior vs exterior?

Interior work is paced by the rooms, the coats and the dry time between them. On a house with sound drywall and one wall color, the walls of a main floor are often finished in a day or two, and trim and doors follow. A full interior, ceilings included, is the several-day job in the opening.

Exterior work is paced by the prep and by the sky. Washing, scraping loose paint, priming bare wood and caulking open joints often take as long as the finish coats. A two-story house, washed, caulked, primed and given two finish coats, commonly takes 3 to 5 working days when the weather holds, longer on a large house or with heavy repairs.

A small single-story house lands at the short end of that range. Bare wood, a tall elevation or a stretch of storms pushes it past the long end.

Our exterior painting jobs run wash, repair, prime, then finish. Interior painting jobs run protect, patch, prime the repairs, then finish. Skipping that front half is how a fast job gets repainted early, which is what our prep guide walks through.

How long does it take to paint a 3-bedroom house?

For a 3-bedroom house with bedrooms, baths, a living area and a kitchen, plan the days from the surfaces in the scope.

Walls only, same color, little patching, is often finished in a couple of days. That is a refresh, and it assumes the crew can reach the walls because furniture is pulled off them. A house with bookcases tight to every wall is a slower job than an empty one of the same size.

Walls plus ceilings, trim and doors, with a color change in a few rooms, often runs several days. A shift from a dark wall to a light one can add another coat and another dry wait, because the first coat does not hide the old color. Deep reds and greens over a light wall need the primer and the coat count on the label, or the old color shows through.

Occupied houses run longer than empty ones. We work room by room so you can live in the rest of the house, which means covering, painting and putting a room back before the next one opens. An empty house lets the crew keep a wet edge across several rooms at once.

What adds days: repairs, humidity, colors, occupied homes, HOA approval?

Drywall repairs, water stains, failed caulk, soft trim and open wood joints are what usually add time. Each repair has to dry and get primed before the finish coat. A stain that bleeds through needs a stain-blocking primer and another stretch of dry time before we can hide it.

Humidity slows an interior too. When the house is muggy and the air is still, latex stays soft and we cannot recoat on the interval the label gives. A metro Atlanta summer does this when the air conditioning is off, so those rooms need a normal temperature and some airflow.

Color adds days when the change is large. Covering a dark accent wall with a pale color is the slow version, and it belongs in the scope before day one so the crew brings the right primer. Cutting in windows and trim is the slow part of an exterior, and a house with a lot of glass spends its days there.

The painting cost page is where those scope differences are spelled out. This page stays on days at the house, not on the price of the work.

HOA approval adds calendar days before we start, not crew days on the wall. If the exterior color is changing, the approval should be in hand before the wash. Waiting on a board in the middle of the job parks the crew.

Neighborhoods in Roswell, Marietta and Johns Creek vary on how strict that review is. We do not schedule a color change until the approval is in hand. Maintenance in the same color usually does not need a new letter, and that job can start on the first dry stretch.

Cabinets are a separate schedule from walls and siding. A kitchen cabinet job is masked, sanded and coated on its own timeline, the way our cabinet painting work is booked, and it is not part of the day count for painting the house.

How long does interior paint take to dry before furniture can go back, and when should you not paint indoors?

Most interior acrylics we use follow the dry and recoat times on the can. Light furniture can often come back the next day, pulled a few inches off the wall so nothing presses the film. Heavy bookcases and washing the paint wait several more days so the film can harden.

Hold off indoors when the house is cold, or closed up and damp. An unheated house, a closed garage or a chilly sunroom can sit under the minimum on the can for ordinary interior latex. A room with the air conditioning off in July, windows shut and no air moving, stays too humid for the coat to cure on schedule. We also wait if a roof leak or a bath fan is still wetting the wall, because paint over that moisture peels.

Kids and pets stay out of a room until the finish coat has skinned and the air has cleared. For a normal daytime job, that means a careful walk-through that evening and moving back in the next day.

How long for exterior paint to dry before rain?

Give a fresh exterior coat the rest of a dry day. Follow the dry time on the can before rain, and give it a full dry night before a soaking rain. A storm before the film has skinned can spot or wash it. After the coat has cured overnight, ordinary rain is what the paint is there to handle.

If the forecast puts a thunderstorm on the same afternoon, we finish prep or paint a covered entry and leave the open elevations for the next dry morning. That call sits in the exterior painting sequence, next to the wash and the repairs.

What should a homeowner do the week before the crew arrives?

Pick the colors and look at samples on the actual wall, in daylight and again at night. A chip that looked right in the store shifts in a north-facing Atlanta room, especially one that only gets indirect light.

Walk the house and mark the repairs you care about: nail pops, cracks, stains, loose caulk, peeling boards. Tell us about them on the walk-through so they are in the scope before day one. The order our crews follow from that list is in the prep guide.

Pull small furniture and wall hangings out of the first rooms, or tell us that labor belongs in the job, and make a plan for pets. If the exterior color needs HOA approval, have the letter before we schedule the wash.

Call (770) 551-0101 or send the details through the quote form. We will confirm the scope, the crew size and the first dry days before anyone shows up with a sprayer.

About the author

Chris Camp is the CEO of Atlanta Painting Company, which has painted homes and businesses across metro Atlanta since 2006. The company is licensed, bonded and insured and TrustDALE certified.